Wholesale DE-LU – All hoursNow 16:00–17:00 21.0 ct/kWh expensiveCheapest until midnight 23:00–00:00 · 14.6 ct/kWh cheapCheapest tomorrowTomorrow 06:00–07:00 · 13.0 ct/kWh cheap
Wattoday.

SOLAR PV · PL · DE · AT

Plug-in solar calculator

Yield, self-consumption and payback of a plug-in solar kit with the current limits in Germany, Austria and Poland.

No investment or tariff advice. The result is an estimate based on the stated assumptions and source data (as of 28.11.2026). Before deciding, compare offers and check terms with the network operator and supplier.

Location and system
Electricity use
Electricity prices

The calculation needs the contract energy price (excl. VAT). Example values: 10 ct 14 ct 18 ct

Plug-in solar kit
More options
Location and system
Electricity use
Plug-in solar kit

Result

The calculation needs the contract energy price (excl. VAT). Example values: 10–18 ct

Annual yield: 635 kWh · Self-consumption: 95 %

Annual yield635 kWh793 kWh/kWp
Self-consumption95 %604 kWh
Self-sufficiency17 %

Exported energy is not paid for.

Austria: the 0 % VAT rate for PV modules applied until 31.12.2025 (UStG § 28(62)); the standard 20 % rate now applies.

Legal limits

The payback only needs the kit cost.

Yield by month (kWh)
  1. Jan40
  2. Feb53
  3. Mar69
  4. Apr65
  5. May52
  6. Jun48
  7. Jul52
  8. Aug58
  9. Sep64
  10. Oct59
  11. Nov38
  12. Dec36
Assumptions, method and sources

Assumptions used

  • Place (PVGIS data): Wien (48.21, 16.37)
  • System size (kWp): 0.80 · Module tilt (°): 90 · Orientation: 0° · System losses (%): 14.0
  • Annual consumption (kWh): 3,500 · Consumption profile: flat (every hour the same)

Method

Yield: mean hourly PVGIS irradiation (2005–2023) per month, sun position, transposition to the module plane (Hay–Davies), reflection losses, module temperature and efficiency (Huld model as used by PVGIS), system losses. Hourly year: the 8,760 hours of the PVGIS typical meteorological year (TMY) with the same calculation, scaled per month to the monthly yield above. Self-consumption and battery: balance of every hour of the year. Model assumption: consumption as a smoothed course by time of day (hourly means, without load peaks), generation in hourly values (without fluctuations within the hour). This still overstates self-consumption and self-sufficiency: for 4,700 kWh a year HTW Berlin (Weniger, Tjaden, Quaschning, photovoltaik 10/2012) reports just under 30% self-sufficiency with 5 kWp without a battery and more than 60% with a 6 kWh battery; this model gives about 36% and 68% (Berlin, 35° south, flat consumption; with the smoothed generation used until 21 November 2026 it was 40% and 72%). Results for self-consumption and batteries should therefore be read as an upper bound. Money: yearly cash flows with degradation and price changes; NPV at the stated rate, IRR by bisection.

Sources and data validity

Irradiation data: PVGIS © European Union, 2001–2026, licence CC BY 4.0; values processed (hourly means and hours of the typical year). PVGIS

  • 0 % VAT for PV modules up to 35 kWp (Austria) – UStG 1994 § 28(62): 0 % for supply and installation of PV modules (up to 35 kWp, on residential and other listed buildings) from 1.1.2024 to 31.3.2025; until 31.12.2025 if the contract was concluded before 7.3.2025. The standard rate applies afterwards. RIS – UStG 1994 § 28 Abs. 62 (Photovoltaikmodule)
  • OeMAG market price for PV (Austria) – OeMAG pays the market price for energy from plants under 500 kWp (§ 13(3) with § 41 ÖSG 2012), set monthly in arrears; values in ct/kWh. Alternatively a feed-in contract with one’s own supplier applies. OeMAG – Marktpreis (Höhe des Marktpreises 2026)
  • Micro generation up to 800 W (Austria) – E-Control (as of 20.11.2026): plants with a total maximum capacity of up to 800 W per grid user (ElWG § 6(1) no. 78) need no network-operator approval but must be notified at least two weeks before commissioning (TOR type A). E-Control – Mini-PV-Anlagen (Kleinsterzeugungsanlagen)
  • Electricity tariff comparison

The values “0 % VAT for PV modules up to 35 kWp (Austria)” were valid until 31.12.2025. New values are not confirmed yet – they were not used.

The values “OeMAG market price for PV (Austria)” are valid until 31.12.2026. Values for the next period are not published yet.

The values “Network charges Burgenland (level 7, 2026)” are valid until 31.12.2026. Values for the next period are not published yet.

The values “Federal levies and metering (2026)” are valid until 31.12.2026. Values for the next period are not published yet.