NET-BILLING · PL
Net-billing in Poland
The Polish prosumer deposit month by month: value of exported energy at hourly RCE, factor 1.23, use within twelve months, refund up to 30 % and amounts that expire.
No investment or tariff advice. The result is an estimate based on the stated assumptions and source data (as of 28.11.2026). Before deciding, compare offers and check terms with the network operator and supplier.
PV example: grid import and export
This example uses illustrative quantities and rates. The household imports in the morning and exports surplus solar later.
- Grid import
- 3 kWh × 1.20 PLN/kWh = 3.60 PLN
- Grid export
- 2 kWh × 0.32 PLN/kWh = 0.64 PLN
- Net of these items
- 2.96 PLN
The example subtracts the export value from import cost. The bill can add fixed fees and apply its own settlement rules.
Result
Annual yield: 8,362 kWh · Self-consumption: 17 % · Savings in year 1: 1,518 PLN
Net-billing: exported energy is valued at RCE (negative = 0), the deposit × 1.23 only pays for energy purchased (not network charges), after twelve months up to 30 % of the value is refunded, the rest expires.
| Month | Exported kWh | Value (RCE) | Deposit (× 1.23) | Energy purchased | Paid from deposit | Paid in cash | Refund | Expires | Balance |
|---|---|---|---|---|---|---|---|---|---|
| Jan | 182 | 122.55 | 80.24 | 140.63 | 140.63 | 0.00 | 0.00 | 0.00 | 2,750.90 |
| Feb | 302 | 141.94 | 150.74 | 112.40 | 112.40 | 0.00 | 0.00 | 0.00 | 2,789.24 |
| Mar | 598 | 139.05 | 174.59 | 107.25 | 107.25 | 0.00 | 42.58 | 2.70 | 2,811.30 |
| Apr | 826 | 130.54 | 171.03 | 91.04 | 91.04 | 0.00 | 41.71 | 38.28 | 2,811.30 |
| May | 903 | 205.55 | 160.57 | 87.46 | 87.46 | 0.00 | 39.16 | 33.94 | 2,811.30 |
| Jun | 920 | 259.57 | 252.83 | 78.14 | 78.14 | 0.00 | 61.66 | 113.02 | 2,811.30 |
| Jul | 902 | 230.77 | 319.27 | 84.87 | 84.87 | 0.00 | 77.87 | 156.53 | 2,811.30 |
| Aug | 867 | 270.62 | 283.84 | 96.41 | 96.41 | 0.00 | 69.23 | 118.20 | 2,811.30 |
| Sep | 701 | 276.08 | 332.86 | 97.79 | 97.79 | 0.00 | 81.19 | 153.88 | 2,811.30 |
| Oct | 460 | 261.81 | 339.58 | 117.26 | 117.26 | 0.00 | 82.82 | 139.50 | 2,811.30 |
| Nov | 183 | 181.88 | 322.03 | 133.82 | 133.82 | 0.00 | 78.54 | 109.67 | 2,811.30 |
| Dec | 129 | 65.23 | 223.72 | 146.72 | 146.72 | 0.00 | 54.57 | 22.43 | 2,811.30 |
| Year total | 6,974 | 2,285.61 | 2,811.30 | 1,293.81 | 1,293.81 | 0.00 | 629.35 | 888.14 |
Mean value per exported kWh: 0.28 PLN/kWh
Payback, NPV and IRR only need the system cost.
Assumptions, method and sources
Assumptions used
- Place (PVGIS data): Warszawa (52.23, 21.01)
- System size (kWp): 8.00 · Module tilt (°): 35 · Orientation: 0° · System losses (%): 14.0
- Annual consumption (kWh): 3,500 · Consumption profile: flat (every hour the same)
- Electricity prices: 1.09 PLN/kWh
Method
Yield: mean hourly PVGIS irradiation (2005–2023) per month, sun position, transposition to the module plane (Hay–Davies), reflection losses, module temperature and efficiency (Huld model as used by PVGIS), system losses. Hourly year: the 8,760 hours of the PVGIS typical meteorological year (TMY) with the same calculation, scaled per month to the monthly yield above. Self-consumption and battery: balance of every hour of the year. Model assumption: consumption as a smoothed course by time of day (hourly means, without load peaks), generation in hourly values (without fluctuations within the hour). This still overstates self-consumption and self-sufficiency: for 4,700 kWh a year HTW Berlin (Weniger, Tjaden, Quaschning, photovoltaik 10/2012) reports just under 30% self-sufficiency with 5 kWp without a battery and more than 60% with a 6 kWh battery; this model gives about 36% and 68% (Berlin, 35° south, flat consumption; with the smoothed generation used until 21 November 2026 it was 40% and 72%). Results for self-consumption and batteries should therefore be read as an upper bound. Money: yearly cash flows with degradation and price changes; NPV at the stated rate, IRR by bisection.
Sources and data validity
Irradiation data: PVGIS © European Union, 2001–2026, licence CC BY 4.0; values processed (hourly means and hours of the typical year). PVGIS
RCE prices: PSE S.A. (raporty.pse.pl), last 365 days. 28.11.2025–27.11.2026
- Net-billing rules (prosumer, Poland) – Polish RES Act: art. 4b(2) (value = quantity × RCE per settlement period, negative RCE = 0), art. 4c(4) (deposit × 1.23), art. 4c(2)–(3) (deposit only pays for energy purchased), art. 4(5) and art. 4c(5)–(6) (12 months), art. 4(11) pt 2 and (11a) (refund up to 30 % / 20 %), art. 4b(3) (15 years). Ustawa o odnawialnych źródłach energii – tekst jednolity Dz.U. 2026 poz. 68 (ELI)
- Notifying the micro-installation to the DSO (Poland) – Polish RES Act art. 5(1): the prosumer informs the distribution system operator at least 30 days before the planned connection of the micro-installation. The act has no separate procedure for plug-in devices. Ustawa o odnawialnych źródłach energii – tekst jednolity Dz.U. 2026 poz. 68 (ELI)
- Mój Prąd programme – application status – Programme website (as of 20.11.2026): the Mój Prąd 6.0 call is closed (last applications 12.09.2025, assessment ongoing); the fund warns about false reports of a “Mój Prąd 7.0”. A granted subsidy can be entered manually. NFOŚiGW – program Mój Prąd
- Electricity tariff comparison
The values “Mój Prąd programme – application status” are valid until 31.12.2026. Values for the next period are not published yet.
The values “Network charges PGE Dystrybucja S.A. (2026)” are valid until 31.12.2026. Values for the next period are not published yet.
The values “RES, cogeneration and capacity charges (2026)” are valid until 31.12.2026. Values for the next period are not published yet.
The values “Energy prices PGE Obrót S.A. (G11/G12, 2026)” are valid until 31.12.2026. Values for the next period are not published yet.
Frequently asked questions
Is the wholesale price the complete electricity bill?
No. Grid costs, supplier additions and taxes may apply. The calculator uses explicitly entered additions in the selected currency.
What happens to an unused deposit?
The deposit can be used for twelve months. Afterwards the overpayment is refunded, at most 30 % of the value of energy exported in that month (20 % for monthly RCEm settlement); the rest expires.