MWh
EV charging windows
Show prices for 29 Nov 2026Show an exampleEnter own pricesPrices for: Poland (PL)Prices for: Germany and Luxembourg (DE-LU)Prices for: Austria (AT)Prices for: Switzerland (CH)
Input is incomplete or invalid. Form fields have been preserved.
Estimated wholesale cost: 12.90 PLN
Charging times
29 Nov 00:00–00:45, 29 Nov 09:30–10:15, 29 Nov 10:30–11:00, 29 Nov 11:15–11:45, 29 Nov 12:30–12:45, 29 Nov 13:00–13:30Prices known until 30 Nov 00:00; the plan only uses this period.
Energy from the grid
33.3 kWhCharge immediately
14.86 PLNdifference: 1.96 PLN
Source / data checked
PSE S.A. – rynkowa cena energii (RCE) · 2026-11-28T15:01:32ZPL · 2026-11-29
Full interval table (13)
| Time (local) | kWh | PLN |
|---|---|---|
| 29 Nov 00:00–00:15 | 2.75 | 0.899 |
| 29 Nov 00:15–00:30 | 2.75 | 1.133 |
| 29 Nov 00:30–00:45 | 0.33 | 0.144 |
| 29 Nov 09:30–09:45 | 2.75 | 1.012 |
| 29 Nov 09:45–10:00 | 2.75 | 1.058 |
| 29 Nov 10:00–10:15 | 2.75 | 1.065 |
| 29 Nov 10:30–10:45 | 2.75 | 1.105 |
| 29 Nov 10:45–11:00 | 2.75 | 1.180 |
| 29 Nov 11:15–11:30 | 2.75 | 1.135 |
| 29 Nov 11:30–11:45 | 2.75 | 1.126 |
| 29 Nov 12:30–12:45 | 2.75 | 1.104 |
| 29 Nov 13:00–13:15 | 2.75 | 0.889 |
| 29 Nov 13:15–13:30 | 2.75 | 1.051 |
No price forecast is provided. Missing data is never replaced with invented values.
Germany: § 14a EnWG – lower grid fees for wallbox, heat pump and battery
Controllable consumption devices above 4.2 kW connection capacity (private wallbox, heat pump, air conditioning, battery storage) commissioned since 1 Jan 2024 may be throttled temporarily to as little as 4.2 kW by the grid operator. In return the grid fee is lower:
- Module 1: flat annual reduction set by the grid operator (about 110 to 190 euros a year according to BNetzA, as of 2023), once per metering point.
- Module 2: working price of the grid fee reduced to 40 % (i.e. by 60 %); requires a separate meter.
- Module 3 (since April 2025, only with module 1): time-variable grid fees in three tiers (high, standard, low) in time windows set each year by the grid operator; requires a smart metering system.
The values are in the grid operator price sheet for grid fees. Excluding taxes and VAT. Source: Bundesnetzagentur – controllable consumption devices (§ 14a EnWG)